DAFTAR ANALISA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Anl.
A3 |
|
1 M3 Menggali Tanah Berbatuan |
|
|
|
|
|
0,005 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
275,00 |
|
1,500 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
67.500,00 |
|
|
|
|
Jumlah |
@Rp. |
67.775,00 |
|
|
|
|
Dibulatkan |
@Rp. |
67.700,00 |
|
|
|
|
|
|
|
|
Anl.
A.18 a |
|
1 M3 Timbunan Tanah Urug |
|
|
|
|
|
1,200 |
m3 |
Tanah Timbun |
@Rp. |
45.000,00 |
@Rp. |
54.000,00 |
|
0,300 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
13.500,00 |
|
0,010 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
550,00 |
|
|
|
|
Jumlah |
@Rp. |
68.050,00 |
|
|
|
|
Dibulatkan |
@Rp. |
68.000,00 |
|
|
|
|
|
|
|
|
Anl.
A.18 |
|
1 M3 Timbunan Pasir Urug |
|
|
|
|
|
1,200 |
m3 |
Pasir Urug |
@Rp. |
60.000,00 |
@Rp. |
72.000,00 |
|
0,300 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
13.500,00 |
|
0,010 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
550,00 |
|
|
|
|
Jumlah |
@Rp. |
86.050,00 |
|
|
|
|
Dibulatkan |
@Rp. |
86.000,00 |
|
|
|
|
|
|
|
|
Anl.
G. 32 h |
|
1 M3 Pondasi Batu Belah 1 Pc : 4 Ps |
|
|
|
|
|
1,200 |
m3 |
Batu Kali/Batu Belah/Batu Gunung |
@Rp. |
120.000,00 |
@Rp. |
144.000,00 |
|
0,522 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
46.980,00 |
|
3,250 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
146.250,00 |
|
3,600 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
162.000,00 |
|
0,120 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
8.400,00 |
|
0,180 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
9.900,00 |
|
1,200 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
72.000,00 |
|
|
|
|
Jumlah |
@Rp. |
589.530,00 |
|
|
|
|
Dibulatkan |
@Rp. |
589.500,00 |
|
|
|
|
|
|
|
|
Anl.G.
33 h |
|
1 M3 Pasangan Batu Bata 1
Pc : 4 Ps |
|
|
|
|
4,500 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
202.500,00 |
|
0,150 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
10.500,00 |
|
0,225 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
12.375,00 |
|
1,500 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
90.000,00 |
|
500 |
bh |
Batu Bata |
@Rp. |
600,00 |
@Rp. |
300.000,00 |
|
0,406 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
36.540,00 |
|
2,530 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
113.850,00 |
|
|
|
|
Jumlah |
@Rp. |
765.765,00 |
|
|
|
|
Dibulatkan |
@Rp. |
765.700,00 |
|
|
|
|
|
|
|
|
Anl.G.
33 i |
|
1 M3 Pasangan Batu Bata
Transram 1 Pc : 2 Ps |
|
|
|
4,500 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
202.500,00 |
|
0,150 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
10.500,00 |
|
0,225 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
12.375,00 |
|
1,500 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
90.000,00 |
|
500 |
bh |
Batu Bata |
@Rp. |
600,00 |
@Rp. |
300.000,00 |
|
0,333 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
29.970,00 |
|
4,120 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
185.400,00 |
|
|
|
|
Jumlah |
@Rp. |
830.745,00 |
|
|
|
|
Dibulatkan |
@Rp. |
830.700,00 |
|
|
|
|
|
|
|
|
Anl.G.
41 |
|
1 M3 Beton Cor 1 : 2 : 3 K 200 |
|
|
|
|
|
6,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
270.000,00 |
|
0,100 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
7.000,00 |
|
0,300 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
16.500,00 |
|
1,000 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
60.000,00 |
|
1 |
m3 |
Kerikil Lokal |
@Rp. |
90.000,00 |
@Rp. |
73.800,00 |
|
0,540 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
48.600,00 |
|
6,800 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
306.000,00 |
|
|
|
|
Jumlah |
@Rp. |
781.900,00 |
|
|
|
|
Dibulatkan |
@Rp. |
781.900,00 |
|
|
|
|
|
|
|
|
Anl.G.
33 i |
|
1 M3 Pasangan Batu Bata
Transram 1 Pc : 2 Ps |
|
|
|
4,500 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
202.500,00 |
|
0,150 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
10.500,00 |
|
0,225 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
12.375,00 |
|
1,500 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
90.000,00 |
|
500 |
bh |
Batu Bata |
@Rp. |
600,00 |
@Rp. |
300.000,00 |
|
0,333 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
29.970,00 |
|
4,120 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
185.400,00 |
|
|
|
|
Jumlah |
@Rp. |
830.745,00 |
|
|
|
|
Dibulatkan |
@Rp. |
830.700,00 |
|
|
|
|
|
|
|
|
Anl.G50
q |
|
1 M2 Plesteran Transram 1 Pc : 2 Ps |
|
|
|
|
|
0,400 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
18.000,00 |
|
0,015 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
1.050,00 |
|
0,020 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
1.100,00 |
|
0,150 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
9.000,00 |
|
0,0171 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
1.539,00 |
|
0,215 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
9.675,00 |
|
|
|
|
Jumlah |
@Rp. |
40.364,00 |
|
|
|
|
Dibulatkan |
@Rp. |
40.300,00 |
|
|
|
|
|
|
|
|
Anl.G50
h |
|
1 M2 Plesteran Transram 1 Pc : 4 Ps |
|
|
|
|
|
0,400 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
18.000,00 |
|
0,015 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
1.050,00 |
|
0,020 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
1.100,00 |
|
0,150 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
9.000,00 |
|
0,0209 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
1.881,00 |
|
0,130 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
5.850,00 |
|
|
|
|
Jumlah |
@Rp. |
36.881,00 |
|
|
|
|
Dibulatkan |
@Rp. |
36.800,00 |
|
|
|
|
|
|
|
|
Anl.
G. 67 |
|
1 M2 Lantai Beton Cor 1 :
3 : 6 tebal 7 cm |
|
|
|
|
0,070 |
m3 |
Batu Pecah 2/3 cm |
@Rp. |
120.000,00 |
@Rp. |
8.400,00 |
|
0,044 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
3.960,00 |
|
0,364 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
16.380,00 |
|
0,720 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
32.400,00 |
|
0,036 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
1.980,00 |
|
0,014 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
980,00 |
|
0,135 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
8.100,00 |
|
|
|
|
Jumlah |
@Rp. |
72.200,00 |
|
|
|
|
Dibulatkan |
@Rp. |
72.200,00 |
|
|
|
|
|
|
|
|
Anl.F.21 |
|
1 M2 Papan Listplank |
|
|
|
|
|
0,280 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
12.600,00 |
|
0,080 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
5.600,00 |
|
0,014 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
770,00 |
|
0,800 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
48.000,00 |
|
1,0000 |
m3 |
Papan Listplank |
@Rp. |
70.000,00 |
@Rp. |
70.000,00 |
|
0,100 |
kg |
Paku Kayu |
@Rp. |
10.000,00 |
@Rp. |
1.000,00 |
|
|
|
|
Jumlah |
@Rp. |
137.970,00 |
|
|
|
|
Dibulatkan |
@Rp. |
137.900,00 |
|
|
|
|
|
|
|
|
Anl.F.22 |
|
1 M3 Perkayuan Kuda-kuda |
|
|
|
|
|
8,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
360.000,00 |
|
2,400 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
168.000,00 |
|
0,400 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
22.000,00 |
|
24,000 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
1.440.000,00 |
|
|
|
|
Jumlah |
@Rp. |
1.990.000,00 |
|
0,7500 |
Untuk ini di ambil 3/4 x upah
pekerja kayu |
@Rp. |
1.990.000,00 |
@Rp. |
1.492.500,00 |
|
1,100 |
m3 |
Balok Kayu Klas II |
@Rp. |
3.000.000,00 |
@Rp. |
3.300.000,00 |
|
|
|
|
Jumlah |
@Rp. |
4.792.500,00 |
|
|
|
|
Dibulatkan |
@Rp. |
4.792.500,00 |
|
|
|
|
|
|
|
|
Anl.F.26 |
|
1 M3 Perkayuan
Kosen-Kosen/Rangka Dinding dan Lantai |
|
|
10,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
450.000,00 |
|
3,000 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
210.000,00 |
|
0,500 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
27.500,00 |
|
30,000 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
1.800.000,00 |
|
|
|
|
Jumlah |
@Rp. |
2.487.500,00 |
|
0,7500 |
Untuk ini di ambil 3/4 x upah
pekerja kayu |
@Rp. |
2.487.500,00 |
@Rp. |
1.865.625,00 |
|
1,000 |
m3 |
Balok Kayu Klas II |
@Rp. |
3.000.000,00 |
@Rp. |
3.000.000,00 |
|
|
|
|
Jumlah |
@Rp. |
4.865.625,00 |
|
|
|
|
Dibulatkan |
@Rp. |
4.865.600,00 |
|
|
|
|
|
|
|
|
SUPL.
H.8 |
|
1 M2 Pasang Atap Metal |
|
|
|
|
|
0,100 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
4.500,00 |
|
0,020 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
1.400,00 |
|
0,005 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
275,00 |
|
0,200 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
12.000,00 |
|
1,2000 |
m2 |
Atap Metal (Sakura Roof) |
@Rp. |
55.000,00 |
@Rp. |
66.000,00 |
|
4,000 |
Bh |
Paku Seng Metal |
@Rp. |
150,00 |
@Rp. |
600,00 |
|
|
|
|
Jumlah |
@Rp. |
84.775,00 |
|
|
|
|
Dibulatkan |
@Rp. |
84.700,00 |
|
|
|
|
|
|
|
|
SUPL.
H.10 |
|
1 M' Pasang Rabung Metal |
|
|
|
|
|
0,100 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
4.500,00 |
|
0,020 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
1.400,00 |
|
0,200 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
12.000,00 |
|
1,200 |
M' |
Rabung Metal (Sakura Roof) |
@Rp. |
45.000,00 |
@Rp. |
54.000,00 |
|
4,0000 |
Bh |
Paku Seng Metal |
@Rp. |
150,00 |
@Rp. |
600,00 |
|
|
|
|
Jumlah |
@Rp. |
72.500,00 |
|
|
|
|
Dibulatkan |
@Rp. |
72.500,00 |
|
|
|
|
|
|
|
|
Anl.
K.9+23 a |
1 M2 Mengecat Tembok 3 Kali |
|
|
|
|
|
0,050 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
2.250,00 |
|
0,0075 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
525,00 |
|
0,0025 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
137,50 |
|
0,075 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
4.500,00 |
|
0,4250 |
kg |
Cat Tembok |
@Rp. |
17.000,00 |
@Rp. |
7.225,00 |
|
|
|
|
Jumlah |
@Rp. |
14.637,50 |
|
|
|
|
Dibulatkan |
@Rp. |
14.600,00 |
|
|
|
|
|
|
|
|
Anl.
K.9+23 b |
1 M2 Mengecat Dengan Cat
Minyak 3 Kali |
|
|
|
|
0,050 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
2.250,00 |
|
0,0075 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
525,00 |
|
0,0030 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
165,00 |
|
0,075 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
4.500,00 |
|
0,643 |
kg |
Cat Minyak |
@Rp. |
35.000,00 |
@Rp. |
22.505,00 |
|
0,100 |
kg |
Dempul Cat/Plamur |
@Rp. |
20.000,00 |
@Rp. |
2.000,00 |
|
0,2000 |
lbr |
Kertas Amplas |
@Rp. |
1.500,00 |
@Rp. |
300,00 |
|
|
|
|
Jumlah |
@Rp. |
32.245,00 |
|
|
|
|
Dibulatkan |
@Rp. |
32.200,00 |
|
|
|
|
|
|
|
|
Anl.
K.9+23 c |
1 M2 Mengecat Meni |
|
|
|
|
|
0,050 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
2.250,00 |
|
0,0075 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
525,00 |
|
0,0025 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
137,50 |
|
0,075 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
4.500,00 |
|
0,4250 |
kg |
Cat Menie |
@Rp. |
20.000,00 |
@Rp. |
8.500,00 |
|
|
|
|
Jumlah |
@Rp. |
15.912,50 |
|
|
|
|
Dibulatkan |
@Rp. |
15.900,00 |
|
|
|
|
|
|
|
|
Anl.
Supl. V |
|
1 M3 Beton Bertulang 1 : 2 : 3 |
|
|
|
|
|
|
a. |
Beton Cor |
|
|
|
|
|
6,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
270.000,00 |
|
0,1000 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
7.000,00 |
|
0,3000 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
16.500,00 |
|
1,000 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
60.000,00 |
|
0,820 |
m3 |
Batu Pecah 2/3 cm |
@Rp. |
120.000,00 |
@Rp. |
98.400,00 |
|
0,540 |
m3 |
Pasir Pasangan Lokal |
@Rp. |
90.000,00 |
@Rp. |
48.600,00 |
|
6,8000 |
Zak |
Semen Andalas @ 40 Kg |
@Rp. |
45.000,00 |
@Rp. |
306.000,00 |
|
|
|
|
Jumlah |
@Rp. |
806.500,00 |
|
|
|
|
Dibulatkan |
@Rp. |
806.500,00 |
|
|
|
|
|
|
|
|
|
|
b. |
Pembesian/Tulangan |
|
|
|
|
|
|
|
Bahan Besi |
|
|
|
|
|
110 |
kg |
Besi Beton Polos |
@Rp. |
11.000,00 |
@Rp. |
1.210.000,00 |
|
2 |
kg |
Kawat Beton |
@Rp. |
12.000,00 |
@Rp. |
24.000,00 |
|
|
|
|
Jumlah |
@Rp. |
1.234.000,00 |
|
|
|
Upah Kerja Besi Beton |
|
|
|
|
|
9 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
405.000,00 |
|
3 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
210.000,00 |
|
9 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
540.000,00 |
|
|
|
|
Jumlah |
@Rp. |
1.155.000,00 |
|
0,750 |
|
Untuk Upah diambil 0,75 |
@Rp. |
1.155.000,00 |
@Rp. |
866.250,00 |
|
|
|
Jumlah Bahan Dan Upah |
|
|
@Rp. |
2.100.250,00 |
|
|
|
|
|
|
|
|
|
|
c. |
Bekisting/Papan Acuan |
|
|
|
|
|
2,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
90.000,00 |
|
0,5000 |
OH |
Kepala Tukang |
@Rp. |
70.000,00 |
@Rp. |
35.000,00 |
|
0,1000 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
5.500,00 |
|
5,000 |
OH |
Tukang |
@Rp. |
60.000,00 |
@Rp. |
300.000,00 |
|
0,400 |
m3 |
Kayu Bekisting |
@Rp. |
2.100.000,00 |
@Rp. |
840.000,00 |
|
4,000 |
kg |
Paku Kayu |
@Rp. |
10.000,00 |
@Rp. |
40.000,00 |
|
|
|
|
Jumlah |
@Rp. |
1.310.500,00 |
|
|
|
|
|
|
|
|
|
|
d. |
Untuk membongkar dan
menyiram beton |
|
|
|
|
4,000 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
180.000,00 |
|
|
|
|
Jumlah |
@Rp. |
180.000,00 |
|
|
|
|
|
|
|
|
|
|
Rekapitulasi Supl. V |
|
|
|
|
|
|
a. |
Beton Cor |
|
|
@Rp. |
806.500,00 |
|
|
b. |
Pembesian/Tulangan |
|
|
@Rp. |
2.100.250,00 |
|
|
c. |
Bekisting/Papan Acuan |
|
|
@Rp. |
1.310.500,00 |
|
|
d. |
Untuk Membongkar Dan Menyiram Beton |
|
@Rp. |
180.000,00 |
|
|
|
|
Jumlah |
@Rp. |
4.397.250,00 |
|
|
|
|
|
|
|
|
Anl.
Supl. VII a |
1 M2 Mengerjakan Plafond
GRC Board 4,5 3 mm |
|
|
|
0,500 |
OH |
Pekerja |
@Rp. |
45.000,00 |
@Rp. |
22.500,00 |
|
0,0250 |
OH |
Mandor |
@Rp. |
55.000,00 |
@Rp. |
1.375,00 |
|
0,0094 |
m3 |
Kayu Klas IV |
@Rp. |
2.250.000,00 |
@Rp. |
21.150,00 |
|
1,100 |
m2 |
GRC Board 4,5 mm |
@Rp. |
45.000,00 |
@Rp. |
49.500,00 |
|
0,020 |
kg |
Paku Kayu |
@Rp. |
10.000,00 |
@Rp. |
200,00 |
|
|
|
|
Jumlah |
@Rp. |
94.725,00 |
|
|
|
|
Dibulatkan |
@Rp. |
94.700,00 |